Define exactly what is changing
A supplier change may mean a distributor, a manufacturing source, or the supplier’s specific commercial grade has changed. Confirm which case applies and whether the proposed material carries a new item identifier, documentation or packaging. Gather approved references for the original input and the records supplied for the proposed item. Use separate entries while the review proceeds so a similar product name cannot hide a sourcing difference.
Ask reviewers to identify affected commitments
The sourcing team can compare availability and supplier responsibilities. The technical owner checks what needs review under the approved product documents. The market and artwork owners check whether approved names or other packaging information could be affected. Track which parts of the project can be evaluated with current records and which need an updated supplier statement or specific review deliverable.
Make the decision and its scope explicit
Document whether the new source is approved only for evaluation or for the specific purchase scope. Record the authorized grade, responsible reviewer and effective date. Ask the supplier how a transfer will be identified in the packaging and paperwork. Agree whether remaining stock from the previous source stays usable for the already authorized scope, and maintain separate traceability if both will be received.
Verify a first receipt under the revised entry
Use the new purchase record and the exact received package to check identity fields and available lot documents. Inform the people who maintain the artwork, sample references and product documentation where the change affects them. Save the first approved receipt referral with the previous decision to preserve the trace. A readily retrievable record helps if a customer or buyer later asks which source applied to a specific lot.